Green Rating for Integrated Habitat Assessment
Project details
Contact person details
Mandatory requirements
Project Owner Information
Registration for
*
GRIHA
SVA GRIHA
SVAGRIHAPRECERTBOTH
PRECERT
LD
SCHOOL
BOTH
GRIHA EB
GRIHA AH
AHPRECERTBOTH
GRIHA Cities
Version
*
- Select -
1.0
1.0
1.0
1.0
1.0
1.0
1.0
2.0
2015
2015
2019
3.0
3.1
3.1
V.2015
V.2019
Project Name
*
Name of the governing agency
*
Project Address
*
State
*
- Select -
Andaman and Nicobar Islands
Andhra Pradesh
Arunachal Pradesh
Assam
Bihar
Chandigarh
Chhattisgarh
Dadra and Nagar Haveli and Daman and Diu
Delhi
Goa
Gujarat
Haryana
Himachal Pradesh
Jammu & Kashmir
Jharkhand
Karnataka
Kerala
Ladakh
Lakshadweep
Madhya Pradesh
Maharashtra
Manipur
Meghalaya
Mizoram
Nagaland
Orissa
Other
Puducherry
Punjab
Rajasthan
Sikkim
Tamil Nadu
Telangana
Tripura
Uttar Pradesh
Uttarakhand
West Bengal
City
*
(In case your city name not available, select nearest city from the list)
- Select -
Abohar
Agartala
Agra
Ahmadnagar
Ahmedabad
Aizawl
Ajmer
Akola
Alappuzha
Aligarh
Alipur Duar
Alwar
Ambala
Amravati
Amritsar
Asansol
Aurangabad
Bakshpur
Bamanpuri
Baramula
Barddhaman
Bareilly
Belgaum
Bellary
Bengaluru
Bhagalpur
Bharatpur
Bharauri
Bhatpara
Bhavnagar
Bhilai
Bhilwara
Bhiwandi
Bhiwani
Bhopal
Bhubaneshwar
Bhuj
Bhusaval
Bidar
Bijapur
Bikaner
Bilaspur
Brahmapur
Budaun
Bulandshahr
Calicut
Chandigarh
Chandrapur
Chennai
Chikka Mandya
Chirala
Coimbatore
Cuddalore
Cuttack
Daman
Daman and Diu
Daryapur
Davangere
Dehra Dun
Delhi
Dhanbad
Dhulia
Dibrugarh
Dindigul
Dispur
Diu
Faizabad
Faridabad
Firozabad
Gandhinagar
Gangtok
Gaya
Ghaziabad
Gopalpur
Greater Noida
Guatemala
Gulbarga
Guntur
Gurgaon
Guwahati
Gwalior
Haldia
Haora
Hapur
Haripur
Hatisa
Hisar
Hospet
Hubli
Hyderabad
Imphal
Indore
Itanagar
Jabalpur
Jaipur
Jaisalmer
Jammu
Jamshedpur
Jhansi
Jodhpur
Jorhat
Kagaznagar
Kakinada
Kalyan
Kanpur
Karimnagar
Karnal
Karur
Kathmandu
Kavaratti
Khammam
Khanapur
Kochi
Kohima
Kolar
Kolhapur
Kolkata
Kollam
Kota
Kozhikode
Krishnanagar
Krishnapuram
Kumbakonam
Kurnool
Latur
Lucknow
Ludhiana
Machilipatnam
Madurai
Malegaon Camp
Mangalore
Mardanpur
Mathura
Meerut
Mirzapur
Moradabad
Mumbai
Mussorie
Muzaffarnagar
Muzaffarpur
Mysore
Nagercoil
Nagpur
Nanded
Nandyal
Nara
Nasik
Navsari
Naya Raipur
Nellore
New Delhi
Nizamabad
Noida
Ongole
Pali
Panaji
Panchkula
Panipat
Parbhani
Pathankot
Patiala
Patna
Pilibhit
Porbandar
Port Blair
Prayagraj
Proddatur
Puducherry
Pune
Puri
Purnea
Raichur
Raipur
Rajahmundry
Rajapalaiyam
Rajkot
Rampura
Ranchi
Ratlam
Raurkela
Rohtak
Saharanpur
Saidapur
Saidpur
Salem
Samlaipadar
Sangli
Saugor
Shahbazpur
Shillong
Shimla
Shimoga
Sikar
Silchar
Siliguri
Silvassa
Sirsa
Solapur
Sonipat
Srinagar
Surat
Tezpur
Thanjavur
Tharati Etawah
Thiruvananthapuram
Tiruchchirappalli
Tirunelveli
Tirupati
Tiruppur
Tiruvannamalai
Tonk
Trivandrum
Tumkur
Tuticorin
Udaipur
Ujjain
Vadodara
Valparai
Varanasi
Vellore
Vijayawada
Vishakhapatnam
Vizianagaram
Warangal
Sanctioning Authority
*
- Select -
Dehu Road Cantonment Board
Gram Panchayant
MIDC
PCMC
PCNTDA
PMC
PMRDA
Town Planning
Pincode
*
Plot area / site area (Sqm)
*
Building type
*
- Select -
Residential
Commercial
Mixed
Residential built up area(Sqm)
*
Day time occupied built up area(Sqm)
*
24X7 occupied built up area(Sqm)
*
Total built up area (Sqm)
*
GRIHA Rating
GRIHA and Pre-Certification Rating
GRIHA AH Rating
GRIHA AH and Pre-Certification Rating
GRIHA Rating
GRIHA and Pre-Certification Rating
GRIHA AH Rating
GRIHA AH and Pre-Certification Rating
SVA GRIHA
SVA GRIHA and Pre-Certification Rating
GRIHA AH Rating
GRIHA AH and Pre-Certification Rating
GRIHA LD
GRIHA AH Rating
GRIHA AH and Pre-Certification Rating
Project Version
Total no. of buildings
*
Does the project have typical buildings?
Yes
No
Unique built-up area(Sqm)
*
Ground coverage area (Sqm)
*
Project typology
*
- Select -
Residential
Commercial
Institutional
Mixed
- Select -
Residential
Hospitality
Healthcare facility
Institutional
Mixed Use
Offices
Retail
Transit terminal
Residential
Construction started on site
*
Yes
No
Status of Construction
Population (as per the latest census)
*
Building is operational since
*
Would you like GRIHA Council to conduct workshop for the team? (Rs. 20,000/- + Taxes extra)
Would you like GRIHA Council to conduct a 1 day training program for the team? (Rs. 20,000/- extra)
Would you like GRIHA Council to conduct additional site visits (besides the final site visit) during construction (before completion) of the project?
How many Visits? (Rs. 20,000/- per visit)
Attach building(s) plan (dwg/pdf/zip/rar)
Attach area statement
Project details
Contact person details
Mandatory requirements
Project Owner Information
Any future correspondence regarding the project will be held with following person:
Name
*
Organization
*
Address
*
State
*
- Select -
Andaman and Nicobar Islands
Andhra Pradesh
Arunachal Pradesh
Assam
Bihar
Chandigarh
Chhattisgarh
Dadra and Nagar Haveli and Daman and Diu
Delhi
Goa
Gujarat
Haryana
Himachal Pradesh
Jammu & Kashmir
Jharkhand
Karnataka
Kerala
Ladakh
Lakshadweep
Madhya Pradesh
Maharashtra
Manipur
Meghalaya
Mizoram
Nagaland
Orissa
Other
Puducherry
Punjab
Rajasthan
Sikkim
Tamil Nadu
Telangana
Tripura
Uttar Pradesh
Uttarakhand
West Bengal
City
*
- Select -
Abohar
Agartala
Agra
Ahmadnagar
Ahmedabad
Aizawl
Ajmer
Akola
Alappuzha
Aligarh
Alipur Duar
Alwar
Ambala
Amravati
Amritsar
Asansol
Aurangabad
Bakshpur
Bamanpuri
Baramula
Barddhaman
Bareilly
Belgaum
Bellary
Bengaluru
Bhagalpur
Bharatpur
Bharauri
Bhatpara
Bhavnagar
Bhilai
Bhilwara
Bhiwandi
Bhiwani
Bhopal
Bhubaneshwar
Bhuj
Bhusaval
Bidar
Bijapur
Bikaner
Bilaspur
Brahmapur
Budaun
Bulandshahr
Calicut
Chandigarh
Chandrapur
Chennai
Chikka Mandya
Chirala
Coimbatore
Cuddalore
Cuttack
Daman
Daman and Diu
Daryapur
Davangere
Dehra Dun
Delhi
Dhanbad
Dhulia
Dibrugarh
Dindigul
Dispur
Diu
Faizabad
Faridabad
Firozabad
Gandhinagar
Gangtok
Gaya
Ghaziabad
Gopalpur
Greater Noida
Guatemala
Gulbarga
Guntur
Gurgaon
Guwahati
Gwalior
Haldia
Haora
Hapur
Haripur
Hatisa
Hisar
Hospet
Hubli
Hyderabad
Imphal
Indore
Itanagar
Jabalpur
Jaipur
Jaisalmer
Jammu
Jamshedpur
Jhansi
Jodhpur
Jorhat
Kagaznagar
Kakinada
Kalyan
Kanpur
Karimnagar
Karnal
Karur
Kathmandu
Kavaratti
Khammam
Khanapur
Kochi
Kohima
Kolar
Kolhapur
Kolkata
Kollam
Kota
Kozhikode
Krishnanagar
Krishnapuram
Kumbakonam
Kurnool
Latur
Lucknow
Ludhiana
Machilipatnam
Madurai
Malegaon Camp
Mangalore
Mardanpur
Mathura
Meerut
Mirzapur
Moradabad
Mumbai
Mussorie
Muzaffarnagar
Muzaffarpur
Mysore
Nagercoil
Nagpur
Nanded
Nandyal
Nara
Nasik
Navsari
Naya Raipur
Nellore
New Delhi
Nizamabad
Noida
Ongole
Pali
Panaji
Panchkula
Panipat
Parbhani
Pathankot
Patiala
Patna
Pilibhit
Porbandar
Port Blair
Prayagraj
Proddatur
Puducherry
Pune
Puri
Purnea
Raichur
Raipur
Rajahmundry
Rajapalaiyam
Rajkot
Rampura
Ranchi
Ratlam
Raurkela
Rohtak
Saharanpur
Saidapur
Saidpur
Salem
Samlaipadar
Sangli
Saugor
Shahbazpur
Shillong
Shimla
Shimoga
Sikar
Silchar
Siliguri
Silvassa
Sirsa
Solapur
Sonipat
Srinagar
Surat
Tezpur
Thanjavur
Tharati Etawah
Thiruvananthapuram
Tiruchchirappalli
Tirunelveli
Tirupati
Tiruppur
Tiruvannamalai
Tonk
Trivandrum
Tumkur
Tuticorin
Udaipur
Ujjain
Vadodara
Valparai
Varanasi
Vellore
Vijayawada
Vishakhapatnam
Vizianagaram
Warangal
Pincode
*
Email
*
Mobile
*
Landline
Project details
Contact person details
Mandatory requirements
Project Owner Information
Agree to All
The site plan must be in conformity to the development plan/master plan/UDPFI guidelines
Yes
No
Preserve existing mature trees on-site
Yes
No
Total surface parking not to exceed as permitted by the local building by-laws
Yes
No
Automatic controls to be installed for 100% of outdoor lights
Yes
No
Provide minimum level of sanitation/safety facilities for construction workers
Yes
No
Reduce air pollution during construction
Yes
No
Reduce water consumption in building by 25 %
Yes
No
Window Wall Ratio (WWR) % less than 60 %
Yes
No
Skylight to Roof Ratio (SRR) less than 5%
Yes
No
Project can provide compliance for shading strategies either by using a single strategy or a combination of any of the following three strategies:
Yes
No
All the fenestrations meet the SHGC (Solar Heat Gain Co-efficient) requirement of ECBC (Energy Conservation Building Code) – 2007
Use Tables 9 & 10 of SP 41 to design the shading device for the windows. Northern region comprises of latitudes more than or equal to 20 degrees North and Southern region comprises of latitudes less than 20 degrees North.
Conduct solar path analysis for windows of AC as well as non-AC spaces, to ensure that the window is completely shaded between 10:00 am on 15th March to 4:00 pm on 30th September
Minimum 25% of the living area shall be daylighted and shall meet the level of daylight prescribed in NBC ( National Building Code) 2005
Yes
No
All mandatory compliance measures (for all applicable buildings) as recommended in the Energy Conservation Building Code 2007 of BEE shall be complied with i.e. building envelope, heating, ventilation and air conditioning, service water heating and pumping, lighting and electrical power
Yes
No
Compliance with thermal comfort condition as prescribed in NBC 2005/ASHRAE and achievement 10 % reduction in GRIHA benchmark EPI (Energy Performance Index)
Yes
No
Rated capacity of proposed renewable energy system is equal to or more than 1% of artificial lighting (internal and external) and space conditioning connected loads
Yes
No
All insulation to be used in the building shall be CFC and HCFC free
Yes
No
All HVAC and refrigeration equipment shall be CFC free
Yes
No
The fire-suppression systems and fire extinguishers shall be halon free
Yes
No
Water used for various purposes like drinking, irrigation etc. shall conform to the BIS standards
Yes
No
Smoking is prohibited on site
OR Necessary provisions shall be provided in the mechanical ventilation system by the HVAC consultant
Yes
No
A mandatory energy audit shall be conducted by a BEE certified energy auditor (post occupancy)
Yes
No
An Operations & Maintenance protocol to be specified for operation and maintenance of the various systems in the building
Yes
No
Project details
Contact person details
Mandatory requirements
Project Owner Information
Agree to All
The site plan must be in conformity to the development plan/master plan/UDPFI guidelines
Yes
No
Preserve existing mature trees on-site
Yes
No
Provide minimum level of sanitation/safety facilities for construction workers
Yes
No
Reduce air pollution during construction
Yes
No
Water used for various purposes like drinking, irrigation etc. shall conform to the BIS standards
Yes
No
Demonstrate through simulation that mean DA requirement (< 3000 lux) is met for 100% of the annual analysis hours for 100% of the regularly occupied areas
Yes
No
Window Wall Ratio (WWR) % less than 60 %
Yes
No
Ensure that vertical fenestration complies with minimum VLT of 0.27
Yes
No
Project can provide compliance for shading strategies either by using a single strategy or a combination of any of the following three strategies:
- All the fenestrations meet the SHGC (Solar Heat Gain Co-efficient) requirement of ECBC (Energy Conservation Building Code) – 2017
- Use Tables 9 and 10 of SP 41 to design the shading device for all the windows
- Conduct solar path analysis for windows of air conditioned as well as non-air conditioned spaces, to ensure that the windows are completely shaded for the duration between 0900 hours on 15th March to 1500 hours on 15th September
Yes
No
Ensure that all regularly occupied spaces meet or exceed illuminance level between 100 lux and 2000 lux for the minimum percentage of floor area prescribed in Table 10.3 for 90% of the potential day lit time in a year. UDI compliance to be demonstrated through simulation using validated software
Yes
No
Artificial lighting design to fall within limits (lower and higher range limits) as recommended space/task specific lighting levels as per NBC 201621 and to meet a minimum uniformity ratio of 0.4.
Yes
No
Ensure that the project meets the thermal comfort requirements for all regularly occupied spaces
Yes
No
Ensure that all interior wall and ceiling finishes (including, but not limited to, primers and paints) have low VOC content and are lead free
Yes
No
Demonstrate that 100% of the annual energy consumption of internal artificial lighting, HVAC, and domestic hot water systems is offset through off-site renewable energy systems
Yes
No
All insulation to be used in the building shall be CFC and HCFC free
Yes
No
All HVAC and refrigeration equipment shall be CFC free
Yes
No
The fire-suppression systems and fire extinguishers shall be halon free
Yes
No
Reduce water consumption in buildings by 10 %
Yes
No
Ensure compliance with all relevant government-notified waste management rules
Yes
No
Ensure that smoking is prohibited on site OR Necessary provisions shall be provided in the mechanical ventilation system by the HVAC consultant
Yes
No
Ensure that a mandatory energy audit shall be conducted by a BEE certified energy auditor (post occupancy)
Yes
No
Ensure that a core facility/service group is formed, which will be responsible for the O&M of the building systems and equipment post installation
Yes
No
Ensure the inclusion of a specific clause in the contract document of the system’s supplier for providing training to the core facility/service group responsible for the O&M of the building systems
Yes
No
Ensure the development of O&M protocol in the form of manual/CDs/multimedia/ information brochure enlisting the best practices for O&M of the building systems
Yes
No
Project details
Contact person details
Mandatory requirements
Project Owner Information
Agree to All
The project for construction must have all necessary clearances as the local building bye-laws/ municipal authorities.
Yes
No
The project should comply with the costal zone regulations, eco sensitive zone regulations, heritage areas, water body zones or any other such regulations concerning a potential hazard area.
Yes
No
Window Wall Ratio (WWR) % should not exceed 60 %
Yes
No
Minimum 25% of the living area shall be daylighted and shall meet the level of daylight prescribed in NBC ( National Building Code) 2005
Yes
No
Minimum threshold points for all category must be met.
Yes
No
Sub-Group
Maximum points
Minimum points to be achieved
Landscape
6
3
Energy
21
11
Water & Waste
11
6
Materials
8
4
Others
4
1
Project details
Contact person details
Mandatory requirements
Project Owner Information
Agree to All
The project for construction must have all necessary clearances as the local building bye-laws/ municipal authorities.
Yes
No
The project should comply with the costal zone regulations, eco sensitive zone regulations, heritage areas, water body zones or any other such regulations concerning a potential hazard area.
Yes
No
Demonstrate that all the appliances installed are BEE star labelled or of equivalent performance.
Yes
No
Minimum threshold points for all category must be met.
Yes
No
Sub-Group
Maximum points
Minimum points to be achieved
Sustainable Site Planning
12
6
Sustainable Building Materials
7
4
Energy Optimization
8
4
Occupant Comfort and Wellbeing
7
4
Water Management
8
4
Solid Waste Management
3
1
Sustainable Lifestyle
5
2
Innovation
2
-
Project details
Contact person details
Mandatory requirements
Project Owner Information
Agree to All
The GRIHA for Existing Building project boundary must comply with applicable municipal, state and local building bylaws related to environmental laws and regulations in place where the project is located.
Yes
No
A built-up area of project must be greater than 2,500 sq. is eligible for rating.
Yes
No
The GRIHA Existing building project must be 75% occupied and all building systems in operational condition for a minimum period of 12 months.
Yes
No
Once the project is rated they must commit to share energy and water consumption data with GRIHA Council for a period of at least 5 years.
Yes
No
Sl. No.
Sections
Maximum points
1.
Site Parameters
06
2.
Maintenance and Housekeeping
17
3.
Energy
35
4.
Water
25
5.
Occupant Health & Comfort
12
6.
Social Aspects
05
7.
Bonus Points
04
Project details
Contact person details
Mandatory requirements
Project Owner Information
Approval/Sanction letter issued by government agency (Central/State/ULBs*) confirming that the project falls under Affordable Housing category or is being developed as per Pradhan Mantri Awas Yojana (PMAY).
Yes
No
Attach the copy of approval letter (jpeg/jpg/png/pdf)
*
The GRIHA for Affordable Housing project boundary must comply with applicable municipal, state and local building bylaws related to environmental laws and regulations in place where the project is located.
Yes
No
* Any other government body/agency.
Agree to All
The site plan must be in conformity to the development plan/master plan/UDPFI guidelines.
Yes
No
Preserve existing mature trees on-site/transplant mature trees on site/compensatory plantation of native trees in ratio 1:3.
Yes
No
Adopt measures on site to prevent air pollution during construction.
Yes
No
Provide 3 meter high barrication around the construction area.
Yes
No
Automatic timer based control for 100% outdoor lighting fixtures.
Yes
No
Install a dedicated energy meter for each dwelling unit.
Yes
No
Reduce water consumption in building by 20 % over base case.
Yes
No
Water meters must be installed at fresh water inlet and STP outlet (if provided).
Yes
No
100% insulation used in the building must be CFC and HCFC free.
Yes
No
Refrigerants used in the HVAC systems must be CFC and HCFC free.
Yes
No
Fire suppression systems and fire extinguishers must be halon free.
Yes
No
Provision for necessary safety equipment and measures as per NBC 2016 must be implemented for construction workers on site.
Yes
No
Provision for drinking water, hygienic working, living conditions and sanitation facilities for construction workers.
Yes
No
Measures to ensure zero exposure of non-smoking occupants to tobacco smoke.
Yes
No
Quality of water from all sources must conform to IS standards (post and pre construction).
Yes
No
Project details
Contact person details
Mandatory requirements
Project Owner Information
Section
Maximum points
Energy management
12
Water management
8
Occupant health and comfort
8
Well being and social aspects
9
Air quality
6
Solid waste management
7
Total
50
Project details
Contact person details
Mandatory requirements
Project Owner Information
Agree to All
The construction site should have necessary clearances and should not be under legal dispute.
Yes
No
Storm water management -
Ensure that the storm water management plan on site is developed such that the post-development peak run-off rate and quantity from 5-year 24 hour design does not exceed the pre-development peak run-off rate and quantity.
Ensure incorporation of Sustainable Urban Drainage Systems (SUDS) and other storm water management strategies in site planning to ensure that 80 per cent of total solids, 95 per cent of litter and at least 90 per cent of hydrocarbons are removed from the storm water.
Yes
No
Reduce the total amount of energy (kWh) required from the local Municipal grid/Diesel gensets by at least 25 per cent.
Yes
No
Outdoor street and security lighting -
Outdoor street and security lighting meets the required lux levels as required by IESNA.
Automatic switching/ dimming controls to be provided for all outdoor lightings.
Yes
No
Reduce the total amount of water required from the local Municipal grid/groundwater by at least 25 per cent.
Yes
No
Quality of water -
Ensure that quality of potable as well as non-potable water complies with relevant BIS standards.
Ensure that quality of captured rainwater for storage and recharge as well as recycled water for use, comply with the relevant BIS standards.
Yes
No
Handling and treatment of special waste -
On-site incinerators to be provided for treatment of medical / hospital waste or provision for the same to be sent to a treatment facility.
Provide contractual tie-up with e-waste recyclers for purchase and safe recycling of e-waste from site.
Yes
No
Reduce emissions, due to intra-site travel, by at least 25 per cent below GRIHA LD base case.
Yes
No
Provision of footpaths and bicycling tracks and for safe interaction of NMT traffic with motorized traffic -
All roads should have footpaths/sidewalks and cycle tracks.
Footpaths, sidewalks and cycle tracks should be continuous, wide and universally accessible.
Supporting infrastructure and facilities like bicycle parking, landscaping, public conveniences, etc., should be provided on site.
Necessary physical safety measures like railings, non-slippery surfaces, etc., must be taken on site.
Yes
No
Facilities for construction workers -
All safety norms of NBC 2005 must be implemented on site during construction.
All construction workers must have access to clean drinking water and hygienic toilets on site.
Accommodation facilities for the construction workers must be clean, hygienic, with access to clean drinking water and toilets.
Child labour should be banned on site.
Yes
No
Project details
Contact person details
Mandatory requirements
Project Owner Information
Year of Establishment
*
School Timings
From:
To:
Number of working days in a year
*
Number of students
*
Number of teachers
*
Number of non-teaching staff
*
Are all classroom air-conditioned
*
Yes
No
Do you have boarding facility (hostel) in your school?
*
Yes
No
Do you have the following
Last one year electricity bills
*
Yes
No
Last one year water bills
*
Yes
No
Last one year diesel bills (if using a diesel generator)
Yes
No
School Type
*
- Select -
Government
Private
Autonomous
Building Type
- Select -
Air-Conditioned
Non Air-Conditioned
Partially Air-Conditioned
Board Followed
- Select -
CBSE
ICSE
State Board
Others
Source of water supply
Project description (Brief summary about the project in around 500 words)
Owner of the building/client name
*
Owner/client Address
*
State
*
- Select -
Andaman and Nicobar Islands
Andhra Pradesh
Arunachal Pradesh
Assam
Bihar
Chandigarh
Chhattisgarh
Dadra and Nagar Haveli and Daman and Diu
Delhi
Goa
Gujarat
Haryana
Himachal Pradesh
Jammu & Kashmir
Jharkhand
Karnataka
Kerala
Ladakh
Lakshadweep
Madhya Pradesh
Maharashtra
Manipur
Meghalaya
Mizoram
Nagaland
Orissa
Other
Puducherry
Punjab
Rajasthan
Sikkim
Tamil Nadu
Telangana
Tripura
Uttar Pradesh
Uttarakhand
West Bengal
City
*
- Select -
Abohar
Agartala
Agra
Ahmadnagar
Ahmedabad
Aizawl
Ajmer
Akola
Alappuzha
Aligarh
Alipur Duar
Alwar
Ambala
Amravati
Amritsar
Asansol
Aurangabad
Bakshpur
Bamanpuri
Baramula
Barddhaman
Bareilly
Belgaum
Bellary
Bengaluru
Bhagalpur
Bharatpur
Bharauri
Bhatpara
Bhavnagar
Bhilai
Bhilwara
Bhiwandi
Bhiwani
Bhopal
Bhubaneshwar
Bhuj
Bhusaval
Bidar
Bijapur
Bikaner
Bilaspur
Brahmapur
Budaun
Bulandshahr
Calicut
Chandigarh
Chandrapur
Chennai
Chikka Mandya
Chirala
Coimbatore
Cuddalore
Cuttack
Daman
Daman and Diu
Daryapur
Davangere
Dehra Dun
Delhi
Dhanbad
Dhulia
Dibrugarh
Dindigul
Dispur
Diu
Faizabad
Faridabad
Firozabad
Gandhinagar
Gangtok
Gaya
Ghaziabad
Gopalpur
Greater Noida
Guatemala
Gulbarga
Guntur
Gurgaon
Guwahati
Gwalior
Haldia
Haora
Hapur
Haripur
Hatisa
Hisar
Hospet
Hubli
Hyderabad
Imphal
Indore
Itanagar
Jabalpur
Jaipur
Jaisalmer
Jammu
Jamshedpur
Jhansi
Jodhpur
Jorhat
Kagaznagar
Kakinada
Kalyan
Kanpur
Karimnagar
Karnal
Karur
Kathmandu
Kavaratti
Khammam
Khanapur
Kochi
Kohima
Kolar
Kolhapur
Kolkata
Kollam
Kota
Kozhikode
Krishnanagar
Krishnapuram
Kumbakonam
Kurnool
Latur
Lucknow
Ludhiana
Machilipatnam
Madurai
Malegaon Camp
Mangalore
Mardanpur
Mathura
Meerut
Mirzapur
Moradabad
Mumbai
Mussorie
Muzaffarnagar
Muzaffarpur
Mysore
Nagercoil
Nagpur
Nanded
Nandyal
Nara
Nasik
Navsari
Naya Raipur
Nellore
New Delhi
Nizamabad
Noida
Ongole
Pali
Panaji
Panchkula
Panipat
Parbhani
Pathankot
Patiala
Patna
Pilibhit
Porbandar
Port Blair
Prayagraj
Proddatur
Puducherry
Pune
Puri
Purnea
Raichur
Raipur
Rajahmundry
Rajapalaiyam
Rajkot
Rampura
Ranchi
Ratlam
Raurkela
Rohtak
Saharanpur
Saidapur
Saidpur
Salem
Samlaipadar
Sangli
Saugor
Shahbazpur
Shillong
Shimla
Shimoga
Sikar
Silchar
Siliguri
Silvassa
Sirsa
Solapur
Sonipat
Srinagar
Surat
Tezpur
Thanjavur
Tharati Etawah
Thiruvananthapuram
Tiruchchirappalli
Tirunelveli
Tirupati
Tiruppur
Tiruvannamalai
Tonk
Trivandrum
Tumkur
Tuticorin
Udaipur
Ujjain
Vadodara
Valparai
Varanasi
Vellore
Vijayawada
Vishakhapatnam
Vizianagaram
Warangal
Pincode
*
Email Id
*
(Multiple email addresses are allowed e.g.(example@example.com, example@example.co.in))
Mobile
Landline
*
Development Type
*
Developer residential townships/commercial
SEZ/Institutional
Educational Campus
Is Master plan required
*
Yes
No
Number of proposed phases
*
Site area of Phase 1
*
Proposed built-up area for Phase 1
Travel and accommodation* for 2 GRIHA Council professionals will be arranged for workshop and mandatory site visits.
Travel and accommodation for 2 GRIHA Council officials will be arranged by client for 2 mandatory site visits and also for orientation workshop (if opted).
If orientation workshop is opted by the client then, travel and accommodation of the GRIHA Council officials will be provided by the client.
Travel and accommodation for 2 GRIHA Council professionals will be arranged by the GRIHA Council for 1 day orientation workshop and 3 mandatory site visits. The cost for arranging the travel and accomodation by GRIHA Council will be communicated over email and the same will be borne by the client. No. of site visits may increase if the site is non-compliant with mandatory criteria
What part of the total built-up area (complete project) will be constructed by the developer/client (please express in percentage of the total)
*
The final proposed population size
*
Year of approval of Masterplan by local authorities
*
EIA received
*
Yes
No
Year of EIA clearance for the project
*
Supply of electricity and water to the site is assured
*
Yes
No
Masterplan consultant/Architect
Name
*
Address
*
City
*
State
*
- Select -
Andaman and Nicobar Islands
Andhra Pradesh
Arunachal Pradesh
Assam
Bihar
Chandigarh
Chhattisgarh
Dadra and Nagar Haveli and Daman and Diu
Delhi
Goa
Gujarat
Haryana
Himachal Pradesh
Jammu & Kashmir
Jharkhand
Karnataka
Kerala
Ladakh
Lakshadweep
Madhya Pradesh
Maharashtra
Manipur
Meghalaya
Mizoram
Nagaland
Orissa
Other
Puducherry
Punjab
Rajasthan
Sikkim
Tamil Nadu
Telangana
Tripura
Uttar Pradesh
Uttarakhand
West Bengal
Pincode
*
Email
*
Mobile
*
Landline
Structural Consultant
Name
Email
MEP Consultant
Name
Email
Environmental/Energy Consultant
Name
Email
Project details
Contact person details
Mandatory requirements
Project Owner Information
Section
Maximum points
Smart Governance
16
Water Supply and Management
20
Sanitation and Municipal Solid Waste Management
18
Sustainable Mobility
18
Energy Optimization and Management
16
Quality of Life
12
Total
100
refresh
Verification Code:
*
InvisibleCaptcha
GRIHA Council